The radiant floor must be laid leaving a perimeter strip along all the walls that delimit the area to be heated. Tubing must be laid at least 50 mm from the perimeter and mm from any possible cause of damage to the tubing e. There must be no areas of irregular shape. The absence of leaks must be documented in a test report which must also include details of the pressure at which the test was performed. It must be covered on top by a protective layer which can be a polyethylene sheet of thickness equal e at least 0.

Author:Nalabar Akinorisar
Country:Equatorial Guinea
Language:English (Spanish)
Genre:Personal Growth
Published (Last):20 December 2004
Pages:480
PDF File Size:8.75 Mb
ePub File Size:15.72 Mb
ISBN:172-3-48050-957-5
Downloads:59047
Price:Free* [*Free Regsitration Required]
Uploader:Douk



The radiant floor must be laid leaving a perimeter strip along all the walls that delimit the area to be heated. Tubing must be laid at least 50 mm from the perimeter and mm from any possible cause of damage to the tubing e. There must be no areas of irregular shape. The absence of leaks must be documented in a test report which must also include details of the pressure at which the test was performed.

It must be covered on top by a protective layer which can be a polyethylene sheet of thickness equal e at least 0. All the service tubing to the systems hydraulic, electrical, sanitary, etc. Accept and continue Learn more about the cookies we use and how to change your settings.

Before laying the screed onto the coils, a pressure of no less than 4 bar and no greater than 6 bar must be applied to make sure there are no leaks. This website is best viewed with version of up to Microsoft Internet Explorer 8 or Firefox 3. The faster, easier way to work with standards.

The screed must be laid respecting the expansion joints where necessary. The distribution manifold must be positioned in such a way as to minimise the length of supply tubing required.

Joints must be positioned by all the doors. For at least 3 days the screed must be protected from drying too quickly. Perimeter strips must also be left around all the structural components of the building that penetrate the screed e. If superficial cuts are made to the screed, these must not have a depth greater than a third of the thickness of the screed.

Guide to radiant comfort Efficient design Ej cooling Regulation Norms. These devices must also work in the absence of an electric current.

During transport and storage idn site, tubing must be protected from external damage and direct sunlight. You may experience issues viewing this site in Internet Explorer 9, 10 or Find Similar Items This product falls into the ej categories. Customers who bought this product also bought BS EN The standard describes the installation of the radiant surface, distinguishing between radiant floors, walls and ceilings.

Let us help you with your project. This means that, whatever the procedures and choices made before the radiant surface is laid, that established in UNI EN must be complied with, without exception, when installing the radiant system. Tubing must be attached using a secure anchoring system that ensures the tubing does not move more dij 5 mm vertically and more than 10 horizontally vin the position where it was installed.

It is the part of the standard that regulates the installation of surface-embedded radiant systems. Learn more about the cookies we use and how to change your settings. Search all products by. In relation to the screed, UNI EN recommends that its thickness is no less than that stipulated by the regulations specifying screed load capacity and bending strength class. Please download Chrome or Firefox or view our browser tips. The perimeter strip must penetrate down to the very bottom of the support don continue up to the finished floor level, allowing for at least 5 mm of screed movement.

The two lengths diin tubing of each circuit that cross the expansion joint both the feed and return tubes may cross only once must be protected with flexible insulation material for a length of at 0.

I want to be contacted. This is to avoid excessive supply tubing making it difficult to manage the temperature of the different rooms. This test can be performed using water or compressed air. The perimeter strip and protective insulation layer must be in such a way that the screed does not seep along the perimeter under the insulation.

Your basket is empty. Joints must be positioned — and be of sufficient number — to delimit areas not exceeding 40 m2 and no longer than 8 m. These dimensions may be exceeded in the case of rectangular areas if one dimension is no more than double the other. It details the minimum material requirements to be used with a radiant surface system and the requirements that have to be met for successful installation.

Prove methods for the determination of the thermal output using calculation and test methods. The thickness of the tubing enn be such as to meet Class 4 requirements according to ISOresistant to a working pressure of 4 bar and expected lifetime of 50 years. BS EN — Water based surface embedded heating and cooling systems.

Installation For example, in the case of an external wall, one layer will be installed directly behind the radiant system and a second layer will be installed externally.

It defines the conditions that must be present at the time of laying the radiant floor system: Click to learn more. Circuit closure and circuit calibration must be independent. Extreme care must be taken when laying the screed so as not to damage any of the components of the radiant floor.

Subscribe to the newsletter. Such protection may be necessary for a longer period if the type of material used for the screed so requires it. TOP 10 Related.

HTTP WWW VIU EDU DOCS FORMS CREDIT CARD AUTHORIZATION PDF

Popular Publishers

Voodoonris There must be no areas of irregular shape. You may experience issues viewing this site in Internet Explorer 9, 10 or Subscribe to the newsletter. Tubing must be attached using a secure anchoring system that ensures the tubing does not move more than 5 mm vertically and more than 10 mm horizontally from the position where it was installed. Find Similar Items This product falls into the following categories. Accept and continue Learn more about the cookies we use and how to change your settings.

BRISTAN LEVER TAPS PDF

DIN EN 1264-4

Faujar Please download Chrome or Firefox or view our browser tips. For at least 3 days the screed must be protected from drying too quickly. You may experience issues viewing this site in Internet Explorer 9, 10 or Click to learn more. Prove methods for the determination of the thermal output using calculation and test methods. BS EN The radiant floor must be laid leaving perimeter strip along all the walls that delimit the area to be heated. These dimensions may be exceeded in the case of rectangular areas if one dimension is no more than double the other.